FROM:
Engineering
SUBJECT:
Title
Final Acceptance of Perimeter Street, Sewer, Storm Drain, Traffic Signal, Interconnect, Signing & Striping, and CFD Landscape Improvements Within the Arboretum Specific Plan for Tract No. 20362
End
RECOMMENDATION:
Recommendation
1. Accept as complete the perimeter street, sewer, storm drain, traffic signal, interconnect, signing & striping, and CFD landscape improvements for Tract No. 20362.
2. Adopt Resolution No. 2025-093, of the City Council of the City of Fontana accepting sewers for Tract No. 20362 as part of the City sewer system.
End
COUNCIL GOALS:
• To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
• To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.
DISCUSSION:
North Fontana Investment Company, LLC constructed perimeter street, streetlights, sewer, storm drain, traffic signal, interconnect, and CFD landscape improvements for Tract No. 20362 located along Sierra Avenue, Duncan Canyon Road, Cypress Avenue, and Casa Grande as part of the Arboretum Specific Plan.
The street, sewer, storm drain, traffic signal, interconnect, signing & striping, and CFD landscape improvements for Tract No. 20362 are complete and acceptance by the City Council is required pursuant to Fontana Municipal Code, Section 26-184(b). Acceptance of the sewer system is limited to the frontage sewer located along Cypress Avenue. The streetlight improvements are installed by Southern California Edison (SCE) and will be an SCE facility, therefore, acceptance by the City Council is not required.
The street, sewer, storm drain, traffic signal, interconnect, signing & striping, and CFD landscape improvements have been completed to the satisfaction of the Department of Public Works/Engineering. By accepting the improvements as complete, the City will be taking over the maintenance of these improvements. SCE will be taking over the maintenance of the streetlight improvements.
This action will also authorize the release of the Faithful Performance Bond, which was posted to guarantee performance of the Subdivision Agreement. It will also authorize the release of the Labor and Material Bond after six (6) months and the Warranty Bond after twelve (12) months, less the total of any claims received by this date. A bond reduction was approved by City Council during the regular meeting on June 13, 2023.
The street, sewer, storm drain, traffic signal, interconnect, signing & striping, and CFD landscape improvements have met all Conditions of Approval and the improvements were inspected by the Department of Engineering.
|
Tract No. |
Bond No. |
Bond Amount |
Bond Type |
|
20362 (Sierra Ave) |
024251511 |
$467,898.40 |
Faithful Performance and Labor & Materials |
|
20362 (Sierra Ave) |
024251511 |
$467,898.40 |
Warranty |
|
20362 (Casa Grande & Cypress) |
024251512 |
$431,363.20 |
Faithful Performance and Labor & Materials |
|
20362 (Casa Grande & Cypress) |
024251512 |
$431,363.20 |
Warranty |
|
20362 (Duncan Canyon Rd) |
024251510 |
$456,686.00 |
Faithful Performance and Labor & Materials |
|
20362 (Duncan Canyon Rd) |
024251540 |
$456,686.00 |
Warranty |
FISCAL IMPACT:
As part of the action to accept as complete the street, sewer, storm drain, traffic signal, interconnect, signing & striping, and CFD landscape improvements for Tract No. 20362, these improvements will be deemed complete and the City will take over the operation and maintenance of these public infrastructures. Appropriate funding for the maintenance work is included in the FY 2025-2026 budget in the Public Works/Engineering Department, under the Utilities & Streets and Parks & Landscape Divisions.
MOTION:
Approve staff recommendation.