Accept as complete the work performed by Gentry General Engineering for the Emergency Repair Storm Structure @ Valley Poplar Culvert project
(PW-25-64-CC) and approve the final contract amount of $ 114,812.72.
End
COUNCIL GOALS:
• Invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
DISCUSSION:
On August 11, the City awarded a contract in the amount of $74,290.59 to Gentry General Engineering for the Emergency Repair of the Storm Structure at Valley and Poplar.
As part of the City’s ongoing efforts to identify, repair, and maintain storm drain infrastructure, this storm structure failure was discovered during the CCTV (Closed Circuit Television) assessments currently being conducted citywide. Upon discovery, the Public Works Utilities Division deemed the repair an emergency and proceeded to obtain quotes immediately to expedite the work. Due to the critical nature of the situation, the City requested immediate mobilization and commencement of construction once contracts were signed.
Following the initial assessment, it was determined that approximately 55 feet of the storm structure had failed and required reconstruction. However, once the roadway was opened, unforeseen conditions revealed that an additional 30 feet of the structure had also failed, which was not visible during the earlier assessment. This additional work required a contract change order in the amount of $40,522.13, bringing the total contract to $114,812.72.
Gentry General Engineering has completed all work to the satisfaction of the City. Timely completion and coordination were essential to minimize disruptions and restoring proper drainage and roadway function.
FISCAL IMPACT:
There is no fiscal impact associated with the approval of this item, the total cost of the project is $114,812.72 and the funds were budgeted in FY 2025/26 in the Streets and Utilities Storm drain budget 28237101- 8130 $40,522.13, and project budget 37100002-601-A-8130 $74,290.59
MOTION:
Approve Staff Recommendation