Title: Approve Extra Work to the Tree Maintenance Services Contract (PW-24-191-SP) for Necessary Tree and Stump Removals on the Citywide Sidewalk Reconstruction Project #3
Attachments: 1. Attachment No. 1- Sidewalk Replacement #3 Construction Impact Report 50825.pdf, 2. Attachment No. 2- Citywide Sidewalk Reconstruction Project #3 .pdf, 3. Attachment No. 3- WCA Proforma 97653.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

FROM:

Engineering

 

SUBJECT:

Title

Approve Extra Work to the Tree Maintenance Services Contract (PW-24-191-SP) for Necessary Tree and Stump Removals on the Citywide Sidewalk Reconstruction Project #3

End

 

RECOMMENDATION:

Recommendation

Approve and authorize the extra work to Tree Maintenance Service Contract with West Coast Arborists Inc. (PW-24-191-SP) in the amount of $89,700.00 for tree removal services.

 

Approve and authorize the purchase order to West Coast Arborists Inc. and any future purchase order change orders necessary to complete the project.

 

End

 

COUNCIL GOALS:

  • To invest in the City’s infrastructure (streets, sewers, parks, etc.) by maintaining and improving the city's existing infrastructure.
  • To invest in the City’s infrastructure (streets, sewers, parks, etc.) by providing for the development of new infrastructure.
  • To invest in the City’s infrastructure (streets, sewers, parks, etc.) by focusing on relief of traffic congestion.

 

DISCUSSION:

The Citywide Sidewalk Reconstruction Project is an on-going project, programmed annually, to reconstruct existing sidewalks and driveway approaches. The project improves walkability, extends sidewalk service life, and enhances pedestrian safety. Citywide Sidewalk Reconstruction Project #3 covers the area east of Cherry Ave, west of Citrus Avenue, north of Foothill Boulevard, and extends to the northern City limits.

 

The sidewalk repair plan calls for the removal of roots encountered during the removal of existing concrete and regrading for the new concrete. An arborist has assessed all trees potentially affected by the project, evaluating their diameter at breast height (DBH), critical root zone (CRZ), and proximity to the adjacent sidewalk. The CRZ for a tree is the minimum root volume necessary for the tree to survive. The size of the CRZ can vary depending on species and life stage; however, generally, roots within three to five times (3x – 5x) the DBH of a tree are part of the CRZ. When structural roots are removed in this zone as part of sidewalk reconstruction, the stability of the tree can be significantly compromised, making the tree more susceptible to root plate failure.

 

Structural surface roots were observed for ninety-six (96) of the assessed trees within the City’s right-of-way that would be impacted by the sidewalk panel reconstruction within three times (3x) the DBH. These trees are recommended for removal. Letters will be mailed to all residents within the project limits, explaining that sidewalk repairs will be done in their area which may result in the removal of existing trees. All efforts will be made to preserve existing trees and only trees that will become unstable due to the cutting of roots will be removed. No private trees will be removed.

 

Tree removal is scheduled to begin in Fall 2025 and will be carried out by West Coast Arborists Inc. (WCA), the City’s current tree maintenance services contractor. Engineering staff recommends that the City Council approve the extra work to the Tree Maintenance Contract (PW-24-191-SP) with WCA in the amount of $89,700.00 for tree removals necessary on the Citywide Sidewalk Reconstruction Project #3.

 

FISCAL IMPACT:

The fiscal impact associated with the approval of this item is $89,700.00 for the full term of the Task Order.  This amount is included in the FY 2025-26 available budget, in Project #37600001-601-C-8130.

 

MOTION:

Approve staff recommendation.